Home/Answers/Contractor
WATER HEATER COST LAB / Contractor

How to Set Up Contractor

To set up Contractor, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-01About 3 minLocal test
Quick answer

To set up Contractor, confirm the input format/device, choose output settings, then run a small batch. Credentials/insurance/permits/portfolio.

Why it matters

Validate on a small sample before running the whole batch.

Credentials.

Step by step

  1. Check capacity/fuel/space/venting/electrical/old unit.
  2. Separate equipment/install/venting/electrical/permits.
  3. Check rebates/tax credits.
  4. Get 2-3 quotes; confirm model/install/warranty.

Common mistakes

  • Equipment price only, not install/venting.
  • Ignoring capacity/space/electrical.
  • Not checking rebates/permits.
  • No model/warranty terms.

Checklist

  • Capacity/fuel/space/venting/electrical.
  • Equipment/install/venting/permits.
  • Rebates/credits/financing.
  • Model/warranty/payment.
  • Budget/maintenance/emergency.

Key facts

  • Credentials.
  • Insurance.
  • Permits.

FAQ

How do I set up Contractor?

To set up Contractor, confirm the input format/device, choose output settings, then run a small batch. Credentials/insurance/permits/portfolio.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Energy.gov